Specifications:
Pipes
- Inner pipe 50 mm. NB. 1000 mm long G. I. pipe.
- Middle pipe 100 mm. NB, 1000 mm long G. I. pipe.
- Outer pipe 150 mm NB. 1000 mm long G. I. pipe.
- A cartridge heater is provided at the axis of pipes.
Lagging
- Asbestos powder filled between inner and middle pipes.
- Saw dust filled between outer and middle pipes.
LATEST BLOG
-
FRF On Composite Materials
April 23, 2020 -
Semapi Corporation collaborates with Flamboyant Solutions
April 18, 2020